
Lifting jobs on the construction site without a crane
Place climate units, roof installations and structural components at height
On hard-to-reach construction sites or rooftops, a heavy-lift drone can deliver directly where a crane cannot reach. We have already placed climate units, motors and structural components on rooftops, safely, quickly and without disrupting the surroundings.
Drone vs. crane
- No crane needed, Less space on site, no truck with outriggers on the construction site.
- Less disruption, Smaller operational footprint and less noise disturbance.
- Faster planning and execution, No weeks of advance booking, typically deployable within 48 hours.
- Proven in practice, Successfully deployed at Basic-Fit for climate installations.

Request construction project
Describe your lifting job: location, payload and timeline.
Or call directly: +31 50 - 305 9797